Electrical job expense cost average?
For my hw, I am doing take off for a 1 story 28325 sq ft building.
I have to account for the costs for the total job expense. The problem is I don’t have experience in the industry.
Can you give some average total cost for electrical distribution, branch, and lighting job.
Per month –
SITE OFFICE (per Month)
SITE STORAGE (per Month)
CONSUMABLES
SMALL TOOLS
COURIER
TEMPORARY LIGHTING
TEMPORARY POWER
SAFETY
SPECIALTY INSURANCE
USL&H INSURANCE
SCAFFOLD RENTAL
SCISSOR LIFT RENTAL ELECT 25′
BUCKET TRUCK RENTAL
BOOM TRUCK RENTAL
SITE VECHICLES
FOREMAN/GF TRUCK
PARKING (per vechicle)
LABELING
FIRESTOPPING
SEISMIC ENG. CALC.
FORKLIFT GAS 15′
BOOM LIFT 40′
BUCKET TRUCK
FENCING
HEATING
EQUIPMENT RENT
COPY PLAN & PRINTS
OFFICE SUPPLIES
DUMPSTER
If I also account for permit cost of 1 %, would I be multipling to the total labor and material cost, subtotal all costs, or profit???
I am taking a class for the major but I don’t have the construction back ground.